Mbyll menynë
  • Home
  • Current Affairs
  • Economy
  • Business
  • Markets
  • Tourism
  • Green
  • Other
  • Blog
  • EN
    • SQ
    • EN

Mali i Zi changes payroll taxation as of January 1, with the minimum wage up to €1,400

6 orë më parë

French giant wins the race for the 98 MW wind farm in Kosovo

6 orë më parë

Elections that could shake Europe

7 orë më parë
Facebook X (Twitter) Instagram
Facebook Instagram X (Twitter) LinkedIn
Ekofin
Abonohu
  • Home
  • Current Affairs
  • Economy
  • Business
  • Markets
  • Tourism
  • Green
  • Other
  • Blog
  • EN
    • SQ
    • EN
Ekofin
Kursi zyrtar BSH
EUR 89,76 ■ 0,00 USD 81,89 ▲ 0,10 GBP 107,47 ▲ 0,24 CHF 97,98 ▼ 0,08 Mali i Zi changes payroll taxation as of January 1, with the minimum wage up to €1,400 French giant wins the race for the 98 MW wind farm in Kosovo Elections that could shake Europe Snow covers road axes in the north and southeast; roads are passable Another €16.77 million for the waste in Elbasan after millions for the incinerator AKU laboratories without accreditation, KLSH raises alarm over flour and bread inspection Property insurance heads into year-end with a decline, claims paid up by 25% The best tourist attractions in Europe for families in 2027, according to tourists EUR 89,76 ■ 0,00 USD 81,89 ▲ 0,10 GBP 107,47 ▲ 0,24 CHF 97,98 ▼ 0,08 Mali i Zi changes payroll taxation as of January 1, with the minimum wage up to €1,400 French giant wins the race for the 98 MW wind farm in Kosovo Elections that could shake Europe Snow covers road axes in the north and southeast; roads are passable Another €16.77 million for the waste in Elbasan after millions for the incinerator AKU laboratories without accreditation, KLSH raises alarm over flour and bread inspection Property insurance heads into year-end with a decline, claims paid up by 25% The best tourist attractions in Europe for families in 2027, according to tourists
Home » French giant wins the race for the 98 MW wind farm in Kosovo
Green

French giant wins the race for the 98 MW wind farm in Kosovo

29 November 2026 · 11:13By ekofin gazetar3 min lexim
Facebook WhatsApp Viber Twitter LinkedIn Copy Link
Ndaj
Facebook Twitter LinkedIn Pinterest Email

The French company AKUO Energy SAS, which is 100% owned by the renowned French private investment firm Ardian, has been officially declared the winner of Kosovo’s first wind energy auction. The project provides for the construction of 98 megawatts of generating capacity, with a winning bid of €75.94 per megawatt-hour.

According to the Ministry of Economy’s announcement, the price offered by “AKUO Energy SAS” is 5.31 percent lower than the ceiling price of 80.20 euros per MWh, set by the Energy Regulatory Office.

In the first phase of this competition, three companies and consortia from France, Turkey, Germany, and Kosovo qualified. After a detailed evaluation of the technical and financial bids, and with no legal complaints filed within the deadline, the ministry officially announced the winner.

Comparison with the region: Auction prices in Albania

The winning bid of €75.94/MWh in Kosovo is almost on the same level as two of the three winning projects from the first wind energy auction in Albania.

In the auction held in Albania in July 2023 (with a total capacity of 222.5 MW), the winning prices closed at €74.00/MWh (the Turkish-Albanian consortium Guris Insaat, Mogan Energy & BRD) and €74.95/MWh (the Austrian company Verbund), while the record-low bid was €44.88/MWh (from Total Eren & KMV).

For comparison, solar (photovoltaic) auctions in Albania have achieved significantly lower prices than wind power, starting from €24.89/MWh in Karavasta (2020) and €29.89/MWh in Spitallë (2021), up to an average of €51.30/MWh in the 2024 hybrid auction.

150 Million Euro Investment and Energy Security

The implementation of this project in Kosovo is expected to bring approximately 150 million euros in direct investment to the energy sector. In addition to creating new jobs, the investment aims to increase domestic production from renewable sources, significantly reduce dependence on electricity imports, and strengthen supply security.

The fact that “AKUO Energy SAS” is part of the Ardian portfolio — one of Europe’s largest investment funds, which fully acquired the company’s shares in July 2025 — gives the project strong financial backing and consolidated international experience in green energy.

The next step is the official signing of the project agreements, which will define the rights and obligations of the parties for the start of implementation on the ground. This auction was held with the support of the International Finance Corporation (IFC), part of the World Bank Group, as well as the Government of Luxembourg through the LuxDev agency.

Report an unethical article to the Ethical Media Alliance
Tirana Bank - Cashback Wizz Air
AKUO Energy SAS Kosovo the energy wind farm
Ndaj. Facebook WhatsApp Viber Twitter LinkedIn Copy Link
ekofin gazetar

Related Posts

Gjiganti francez fiton garën për parkun eolik 98 MW në Kosovë

6 orë më parë

Another €16.77 million for the waste in Elbasan after millions for the incinerator

10 orë më parë

The government is preparing to forgive 36,000 energy bills for the years 2008–2013

27 November 2026
Lini një koment Cancel Reply

Më të lexuarat

60 euros per day, coffee, croissant, chicken, and beer for lunch / Greek farmers complain about the demands of seasonal workers

26 October 2026

Profit distribution: shareholders will be forced to return unauthorized payments

22 October 2026

Enian Sina is appointed as the new administrator of the Universal Service Provider

26 November 2026

EU-Western Balkans Investment Forum, agenda of the two-day meeting in Tirana

24 November 2026

Plan to change the entrance to Tirana: a new four-lane road from Rinas to Paskuqan

25 November 2026
Të fundit

Mali i Zi changes payroll taxation as of January 1, with the minimum wage up to €1,400

6 orë më parë

French giant wins the race for the 98 MW wind farm in Kosovo

6 orë më parë

Elections that could shake Europe

7 orë më parë

Snow covers road axes in the north and southeast; roads are passable

8 orë më parë

Another €16.77 million for the waste in Elbasan after millions for the incinerator

10 orë më parë
Advertisement
Kredo.al – kredi me një këst Fondi BESA – mbështesim biznesin tuaj ABI Bank – Kredia Hipotekore Premier
Rreth nesh
Rreth nesh

Gjithçka nis nga Ekonomia.

  • Informacione, analiza, të dhëna rreth zhvillimeve ekonomike dhe financiare.
  • Qytetarët në fokus. Në mbrojtje të bizneseve.
  • Gjithçka për transparencën.
Facebook Instagram X (Twitter) LinkedIn
Kontakt

NIPT: M61816014C

Email: [email protected]

Report an unethical article to the Ethical Media Alliance
© 2026 Ekofin.

Shkruani më lart dhe shtypni Enter për të kërkuar. Shtypni Esc për të anuluar.