Albania will have its first wind power generation park, with an installed capacity of 84 MW. The German company Nordex Group has announced its first entry into the Albanian market, having secured a contract from the Austrian energy company VERBUND for the supply and installation of 12 wind turbines in the Spille project.
The project represents an important development for the Albanian energy sector, marking a concrete step towards diversifying electricity production sources and reducing dependence on hydroelectric plants.
According to the announcement from Nordex Group, the contract foresees the supply and installation of 12 turbines model N163/6.X, which will provide a total capacity of 84 MW. The agreement also includes a 15-year contract for maintenance services and technical assistance, through the Premium Service program.
The wind farm will be built in the Spille area, about 50 kilometers south of the port city of Durrës. The turbines will be installed on steel towers, with a height of 113 meters up to the rotor center, enabling the exploitation of wind potential for electricity production.
According to current planning, the park is expected to become operational in the spring of 2028, marking the start of production of a new renewable energy capacity in Albania.
The Austrian company VERBUND was selected to develop the project following an international tender, while the cooperation with Nordex aims to realize the investment and ensure the long-term operation of the plant.
The Managing Director of VERBUND Green Power, Dietmar Reiner, described the project as a historic moment for Albania’s energy transition and an important step in the company’s expansion strategy.
“The Spille project, the first wind farm in Albania, marks an important moment in the country’s energy transition and represents a step forward in our growth strategy. Nordex’s expertise and commitment give us full confidence in this project, while our long-term partnership is based on shared values and a shared vision for the future,” Reiner stated.
The CEO of Nordex Group, José Luis Blanco, also emphasized the importance of the company’s entry into the Albanian market, considering the project as an indicator of the growing potential of wind energy in the country.
“Entering a new market is always an important moment for us, and we are very pleased to be taking this step in Albania together with VERBUND. The Spille project demonstrates the growing opportunities for wind energy in the country. With our N163/6.X technology and long-term services, we aim to contribute to the further diversification of renewable energy sources in Albania,” Blanco stated.
The contract for the Spille park is part of a broader collaboration between Nordex and VERBUND Green Power. In January 2026, the two companies signed a multi-year framework agreement, which foresees the possibility of supplying wind turbines for projects with a total capacity of up to 700 MW in six European markets, including Albania.
The development of the Spille park comes at a time when Albania is trying to expand its energy production capacities from other renewable sources, beyond the hydroelectric plants that have historically dominated the power system. /ekofin.al
